SIP Certified® Standards 2026
SIP Standards | Onsite Questions | 2026
1 — Conservation and Enhancement of Biological Diversity
1.1 Conservation and Enhancement of Biological Diversity
Requirements
| 1. |
You must have and update at least every five years a conservation plan based on the type(s) of habitat affected by new vineyard development and/or ongoing vineyard operations. A Natural Resource Conservation Service Conservation Plan or equivalent qualifies. Equivalent plans will address the following sections. Download template.
Onsite Inspection Required |
Attach conservation plan including identification of habitat areas on your ranch map and document below what sensitive species, if any, exist in your area. When was the plan last completed? |
Management Enhancements
| 3. |
What percent of the property is maintained as non-vineyard habitat (i.e. native and naturalized grasses, flowering plants, shrubs and trees in corners, edges and corridors)?
Onsite Inspection Required |
[ ] >30% (6 pts.) [ ] 20-29% (4 pts.) [ ] 10-19% (2 pts.) [ ] <10% (0 pts.) Attach ranch map marked with percent of property maintained in non-vineyard habitat. |
| 5. |
Are insectary rows maintained every 5 – 10 rows?
Onsite Inspection Required |
[ ] Yes
(5 pts.)
[ ] No
If yes, indicate Insectary plantings on ranch map. Provide documentation of insectary row species composition. |
| 6. |
Do you have bat boxes as a means of insect pest control and/or raptor perches or owl boxes as a means of vertebrate pest control?
D+O — Req'd for Documentation+Onsite renewals Photo(s) Required Onsite Inspection Required |
[ ] Yes
(5 pts.)
[ ] No
Update photo documentation of bat box, owl box, and/or raptor perch. |
2 — Vineyard Acquisition, Establishment and Management
2.3 Spacing, Orientation, and Trellis Selection
Requirements
(No requirements in this section.)
Management Enhancements
| 2. |
Did you choose spacing based on soil type, rootstock, terrain, variety, and clone?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Explain. |
| 3. |
Was your trellis and training system designed to optimize canopy microclimate and sunlight exposure, and minimize disease and insect pressure?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Provide a written description of your trellis system(s) and how it addresses these issues. |
2.4 Canopy Management
Requirements
(No requirements in this section.)
Management Enhancements
| 1. |
Is your canopy microclimate monitored?
Onsite Inspection Required |
[ ] Yes – Point Quadrant Method – Number of leaf layers, % gaps, % interior leaves, and % interior clusters (2 pts.) [ ] Yes – Datalogger – air temperature and/or humidity (relative to outside the canopy) (2 pts.) [ ] Yes – Light bar/Ceptometer – % light penetration or degree of shading (2 pts.) [ ] Yes – Other (2 pts.) [ ] NoDescribe monitoring. |
2.6 Fertilization
Requirements
(No requirements in this section.)
Management Enhancements
| 5. |
If your vineyard has a nitrogen requirement, as determined by a soil or tissue test, does your cover crop include a nitrogen-fixer (clovers, vetches, legumes, etc.)?
Onsite Inspection Required |
[ ] Yes
(3 pts.)
[ ] No
[ ] Not Applicable Provide a written description of nitrogen fixing cover crop and management practices. If not applicable, provide written explanation. |
3 — Winery Facility Establishment and Management
3.1 Facility Planning and Construction
Requirements
| 1. |
Your ventilation system(s) must be designed to handle all chemicals and gasses involved in wine production.
Onsite Inspection Required |
Describe the ventilation system. |
Management Enhancements
| 3. |
Is your building located to take advantage of solar orientation for daylighting, passive heating and/or cooling, etc.?
Onsite Inspection Required |
[ ] Yes
(3 pts.)
[ ] Not Applicable
[ ] No
Describe how passive solar was incorporated into the building design and attach an architectural floor plan or details showing how passive solar elements were constructed. If Not applicable, explain. |
| 5. |
Does the building have glazing, high U-value, or other high efficiency windows installed and/or solar shading?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
[ ] Not applicable only if facility was constructed prior to ownership and windows have not been retrofitted since purchase. List or show on facility map where windows are installed and U-value rating. |
| 6. |
Does the winery have sloped/free draining floors? Not applicable only if facility was constructed prior to ownership.
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
[ ] Not Applicable
Describe percent slope and drain location(s). |
| 7. |
Is gravity flow incorporated into your production areas?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
Describe the use of gravity flow and show on attached facility map. [ ] No |
| 8. |
Do you have subsurface or naturally cooled rooms?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Outline the square footage of applicable rooms on a facility map. |
4 — Vineyard Soil Conservation and Surface Water Quality
4.1 Post-Plant/Purchase
Requirements
(No requirements in this section.)
Management Enhancements
| 2. |
Do you use tractors and/or vineyard equipment that minimize soil compaction, such as high floatation tires, track-layers, or over the row equipment?
Onsite Inspection Required |
[ ] Greater than or equal to 75% of total equipment (2 pts.) [ ] Between 25% and 75% of total equipment (1 pts.) [ ] Less than 25% of total equipment If yes, list equipment. |
| 6. |
Do you use GIS/GPS/precision equipment that reduce pesticide and fertilizer use while preserving efficacy?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
If yes, describe equipment and how it relates to reduced pesticide and fertilizer use and increased efficacy. |
| 8. |
Do you store liquid materials separately from dry materials, and are dry materials elevated above the spill zone?
D+O — Req'd for Documentation+Onsite renewals Photo(s) Required Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
If yes, provide photo documentation. |
| 9. |
Is mixing and loading performed on sites with low runoff hazard?
D+O — Req'd for Documentation+Onsite renewals Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
If yes, explain. |
4.2 Erosion Control and Prevention of Offsite Movement
Requirements
| 4. |
You must have vegetated perimeter buffers of no less than 25 feet from the setback of perennial streams and/or wetland areas.
Onsite Inspection Required |
Indicate perimeter buffers on ranch map. Not Applicable only if there are no perennial streams and wetland areas on the property. Provide written statement. |
5 — Water Conservation and Quality
5.2 Vineyard Water Use Efficiency
Requirements
| 2. |
You must use a low-volume irrigation system (drip or micro-sprinkler) for irrigating during the growing season.
Onsite Inspection Required |
Provide a written statement of your low-volume irrigation system including emitter spacing, tube gauge and emitter flow rate. |
5.3 Vineyard Irrigation Scheduling
Requirements
(No requirements in this section.)
Management Enhancements
| 5. |
Are there flow meters on all the wells or other pumps to monitor water usage over the season and are logs kept?
Onsite Inspection Required |
[ ] Yes
(4 pts.)
[ ] No
Provide written description of flow meter locations. |
5.4 Winery Water Conservation
Requirements
(No requirements in this section.)
Management Enhancements
| 6. |
Do you have high-efficiency/low-flow toilets (e.g. less than 1.6 gallons per flush) and low-flow aerators installed on sink faucets and/or showerheads?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe. |
5.11 Winery Landscaping
Requirements
| 1. |
You must do at least three of the following to prevent erosion on the grounds.
Onsite Inspection Required |
[ ] Plant appropriate plant materials to slow or prevent water runoff [ ] Use mulches, ground covers, or other semi-permeable materials to cover and retain soil [ ] Replant bare soil as necessary [ ] Use sand bags and fiber rolls when necessary to keep water from gaining speed, and to hold water on property [ ] Use diversion ditches when necessary to keep water from gaining speed, and to hold water on property Check all that apply and describe measures taken. |
6 — Energy Conservation and Efficiency
6.1 Energy Use
Requirements
(No requirements in this section.)
Management Enhancements
| 5. |
Do you use grazing animals within your vineyard or buffer zones to reduce mechanical workload?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe practices. |
6.2 Refrigeration
Requirements
| 1. |
The chiller system must be designed and sized appropriately for your winery.
Onsite Inspection Required |
Describe how the chiller system was selected. |
6.4 Pumps, Motors, Drives, Air Compressors, and Dryers
Requirements
| 2. |
Air compressors must be sized correctly and provide your winery with efficient and optimal performance.
Onsite Inspection Required |
List air compressor associated with winery operations and describe how you determine appropriate sizing for your needs. |
6.5 HVAC
Requirements
| 1. |
You must reduce heating and cooling loads by utilizing at least four of the following:
Onsite Inspection Required |
[ ] Temperature controlled cellars [ ] Louvered ventilation panels [ ] Timed automatic door openers [ ] Insulated doors/roll-up doors [ ] Strip doors/high-speed roll-up doors [ ] Weather stripping |
Management Enhancements
| 4. |
Are unused or seasonally-used areas closed and secured, have utilities turned off and/or equipment unplugged when not in use?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe procedure. |
6.6 Lighting
Requirements
(No requirements in this section.)
Management Enhancements
| 5. |
Is natural lighting used where available?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe. |
| 6. |
Are outside production lights shielded to direct light onto task areas and away from neighbors?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe. |
6.7 Thermostats
Requirements
| 1. |
All temperature controlled rooms, including office and hospitality spaces, must have functioning thermostats that are programmed to conserve energy.
Onsite Inspection Required |
Attach procedure for room thermostats. |
Management Enhancements
| 4. |
Do you have on-demand hot water heater(s) at point of use locations?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe location(s) and use. |
7 — Pollution and Waste
7.1 Vineyard Air Quality
Requirements
(No requirements in this section.)
Management Enhancements
| 14. |
Are your spray operators and foreman equipped with wind speed measurement devices?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
List wind speed measurement device(s): |
7.2 Pollution
Requirements
(No requirements in this section.)
Management Enhancements
| 7. |
Do you use electric forklifts indoors?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
List equipment. |
7.3 Hazardous Material Management
Requirements
| 4. |
You must store hazardous materials in a safe, secure location and use oldest materials first.
Onsite Inspection Required |
Indicate storage location on a facilities map. |
| 5. |
All lubricants and wine production contact surfaces must be food grade.
Onsite Inspection Required |
List products used. |
7.4 Winery Solid Waste Management
Requirements
(No requirements in this section.)
Management Enhancements
| 7. |
Do you use low-waste filtration technology such as cross-flow filtration?
Onsite Inspection Required |
[ ] Yes
(3 pts.)
[ ] No
Name low-waste filtration system. |
7.6 Lab Chemicals
Requirements
| 1. |
You must have a program in place listing all reagents and chemicals used in the lab and their proper disposal method as per SDS.
Onsite Inspection Required |
Attach list and disposal procedure. |
8 — Purchasing, Recycling, and Waste Reduction
8.2 Waste Reduction
Requirements
(No requirements in this section.)
Management Enhancements
| 6. |
Is compostable waste collected separately from trash and composted?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe. |
8.3 Packaging and Materials
Requirements
(No requirements in this section.)
Management Enhancements
| 3. |
Do you use lightweight glass (less than 440 grams) to cut down on weight of freight and carbon footprint?
Onsite Inspection Required |
[ ] 75 - 100% of production (3 pts.) [ ] 50 - 75% of production (2 pts.) [ ] 25 - 50% of production (1 pts.) [ ] 0 - 25% of production |
9 — Pest Management
9.7 Winery Pest Management
Requirements
(No requirements in this section.)
Management Enhancements
| 4. |
Do you store winery waste, byproducts, and wood pallets offsite or away from the winery buildings in order to deter pests?
Onsite Inspection Required |
[ ] Yes
(2 pts.)
[ ] No
Describe storage location and show on map. |